# Gate Prompt Templates (Codex)
|
|
|
|
Copy/adapt these templates per gate. Keep prompts explicit and evidence-oriented.
|
|
|
|
## Common Prompt Header
|
|
|
|
```text
|
|
You are implementing Gate <GATE_ID> for this project.
|
|
|
|
Constraints:
|
|
- Follow AGENTS.md workflow rules exactly.
|
|
- Update documentation after every meaningful change.
|
|
- Run required validations and report evidence.
|
|
- Do not claim completion without test outputs.
|
|
- Do not assume requirements; if unclear, stop and ask.
|
|
- If spec reference is missing for implementation work, return BLOCKED and do not code.
|
|
|
|
Output contract (mandatory):
|
|
- STATUS: DONE | BLOCKED
|
|
- TASK: <single task>
|
|
- SPEC_REF: <reference or BLOCKED reason>
|
|
- FILES_CHANGED: <list>
|
|
- VALIDATION_RUN: <commands + outcomes>
|
|
- OPENCLAW_VERIFY: <cli checks + browser checks or N/A>
|
|
- RISKS: <list or NONE>
|
|
|
|
Required docs updates:
|
|
- docs/tasks.md
|
|
- docs/progress.md
|
|
- docs/change-log.md
|
|
- docs/traceability.md
|
|
- docs/test-results.md
|
|
|
|
When fully done, run:
|
|
openclaw gateway wake --text "Done: <GATE_ID> completed with evidence" --mode now
|
|
```
|
|
|
|
## G1 Planning Prompt
|
|
|
|
```text
|
|
Objective: Complete planning artifacts.
|
|
|
|
Tasks:
|
|
1) Finalize requirements with testable acceptance criteria.
|
|
2) Capture Definition of Done.
|
|
3) List assumptions and risks.
|
|
4) If research_mode=true, produce docs/research-notes.md with options and recommendation.
|
|
|
|
Validations:
|
|
- Ensure requirements are testable and unambiguous.
|
|
- Ensure acceptance criteria map to at least one test each.
|
|
|
|
Done condition:
|
|
- docs/requirements.md complete
|
|
- docs/plan.md updated
|
|
- docs/progress.md updated for G1
|
|
```
|
|
|
|
## G2 Architecture Prompt
|
|
|
|
```text
|
|
Objective: Complete architecture baseline and ADR.
|
|
|
|
Tasks:
|
|
1) Update docs/architecture.md (components, data flow, deployment, security baseline).
|
|
2) Update docs/adr/ADR-0001-initial-architecture.md with alternatives and trade-offs.
|
|
3) For brownfield, ensure as-is architecture + migration artifacts are current.
|
|
|
|
Validations:
|
|
- Architecture supports must-have journeys.
|
|
- ADR includes at least 2 alternatives.
|
|
|
|
Done condition:
|
|
- G2 artifacts complete and cross-linked in docs/traceability.md
|
|
```
|
|
|
|
## G3 Slice-1 Prompt
|
|
|
|
```text
|
|
Objective: Deliver and verify first vertical slice.
|
|
|
|
Tasks:
|
|
1) Implement first slice for the top priority user journey.
|
|
2) Add unit and integration tests for this slice.
|
|
3) Execute manual smoke test for the slice.
|
|
|
|
Validations:
|
|
- unit tests pass
|
|
- integration tests pass
|
|
- manual smoke scenario recorded in docs/test-results.md
|
|
|
|
Done condition:
|
|
- slice-1 works end-to-end with evidence
|
|
```
|
|
|
|
## G4 Full Build Prompt
|
|
|
|
```text
|
|
Objective: Complete full build and baseline verification.
|
|
|
|
Tasks:
|
|
1) Implement remaining in-scope v1 features.
|
|
2) Run full validation suite.
|
|
3) Resolve failures or document blockers.
|
|
|
|
Validations:
|
|
- lint/type/build pass
|
|
- unit/integration/e2e pass
|
|
- contract checks pass if API boundaries exist
|
|
|
|
Done condition:
|
|
- all in-scope features implemented and verified
|
|
```
|
|
|
|
## G5 Security & Quality Prompt
|
|
|
|
```text
|
|
Objective: Execute security and quality gate.
|
|
|
|
Tasks:
|
|
1) Run dependency/secret baseline checks.
|
|
2) Verify auth/input validation/error handling.
|
|
3) Run performance smoke checks.
|
|
|
|
Validations:
|
|
- no unresolved critical/high issues
|
|
- mitigation plan logged for medium/low issues
|
|
|
|
Done condition:
|
|
- security and quality evidence logged
|
|
```
|
|
|
|
## G6 Release Candidate Prompt
|
|
|
|
```text
|
|
Objective: Prepare and verify release candidate.
|
|
|
|
Tasks:
|
|
1) Complete release checklist.
|
|
2) Validate rollback instructions.
|
|
3) Confirm monitoring/alerts baseline.
|
|
|
|
Validations:
|
|
- release-checklist complete
|
|
- rollback approach validated
|
|
- docs versioned and coherent
|
|
|
|
Done condition:
|
|
- RC ready for approval/deployment
|
|
```
|
|
|
|
## G7 Handover Prompt
|
|
|
|
```text
|
|
Objective: Complete handover and close orchestration.
|
|
|
|
Tasks:
|
|
1) Execute post-deploy smoke tests.
|
|
2) Finalize handover notes + runbook pointers.
|
|
3) Create next-iteration backlog.
|
|
|
|
Validations:
|
|
- critical journeys pass in deployed environment
|
|
- unresolved risks have owners
|
|
|
|
Done condition:
|
|
- docs/progress.md reaches 100% and project is handover-ready
|
|
```
|