Gate Checklists

G0 Intake Complete

  • Planning questionnaire started
  • Mission, scope, journeys captured
  • project_mode and execution_mode selected

G1 Planning Approved

  • Requirements testable and clear
  • Specs created for all v1 features (in docs/specs/ or docs/requirements.md)
  • Each spec has acceptance criteria (testable, not vague)
  • Definition of Done captured
  • Acceptance tests drafted
  • Risks and assumptions listed

G2 Architecture Approved

Common:

  • architecture doc updated
  • ADR-0001 completed with alternatives
  • ADRs reference relevant specs
  • test strategy and security baseline included
  • docs/specs/ directory exists with feature specs

Greenfield preconditions:

  • bootstrap architecture is complete
  • At least one feature spec approved

Brownfield preconditions:

  • as-is architecture complete
  • system inventory + dependency map complete
  • characterization baseline exists
  • migration plan + compatibility matrix complete
  • Existing behavior documented before changes specced

G3 Slice-1 Build Verified

  • Task references spec section (e.g., Spec: specs/auth.md#login)
  • first vertical slice implemented
  • Implementation matches spec acceptance criteria
  • unit tests pass for slice
  • integration test for key path passes
  • manual smoke path passes
  • docs updated

G4 Full Build Verified

  • All tasks in g4-task-plan.md have spec references
  • lint/type/build pass
  • unit + integration suite pass
  • e2e critical paths pass
  • contract checks pass (if API boundaries exist)
  • migration checks pass (brownfield)
  • All spec acceptance criteria verified

G5 Security & Quality Verified

  • secret scanning baseline
  • dependency vulnerability baseline
  • auth/authorization checks
  • input validation checks
  • error handling/logging checks
  • performance smoke checks

G6 Release Candidate Verified

  • release checklist complete
  • rollback instructions tested/validated
  • monitoring/alerts configured
  • open risks acknowledged

G7 Production/Handover Complete

  • post-deploy smoke passes
  • handover notes complete
  • incident/runbook notes complete
  • backlog of follow-ups created

State Transitions

Allowed: PENDING -> IN_PROGRESS -> PASS/FAIL/BLOCKED

  • FAIL requires evidence + remediation plan
  • BLOCKED requires owner + unblock condition