wiki(audit): 2026-10-28 window — radar stage-1 iteration cap (no handoff, stage-2 no-oped), stocktake 400 never alerted, Steel removed from the stack

This commit is contained in:
hermes
2026-10-29 00:41:30 +08:00
parent 2cbf0b65c1
commit ec0c30fb30
12 changed files with 374 additions and 27 deletions
@@ -3,8 +3,8 @@ title: Job Radar Stage 1 Exhausted Its Tool-Call Budget on 2026-10-27 — Notion
type: incident
status: active
created: 2026-10-28
updated: 2026-10-28
verified_on: 2026-10-28
updated: 2026-10-29
verified_on: 2026-10-29
review_after: 2026-11-04
confidence: high
tags: [automation, cron, jobs, notion, silent-failure, scheduling]
@@ -85,6 +85,22 @@ Fleet size went **28 → 29 jobs** (26 enabled / 3 disabled).
4. The incident row stays open until a clean stage-1 slot auto-closes it — confirm the 2026-10-28 07:00 slot
closes `dca848_e93a538ade6b`.
## Follow-up — the 2026-10-28 slot (recorded 2026-10-29)
The **first real two-stage cycle ran on 2026-10-28** and answered the open questions above — not favourably:
- **Stage 1 overran again, on a new signature.** `dca8482e4f76` ran **07:00:32 → 10:33:18** (**3 h 32 m 46 s**),
closed **`failed`**, `failure_streak` **2**, on *"hit the agent iteration cap before the handoff could be
written"* → [[incidents/2026-10-28-job-radar-stage1-iteration-cap]].
- **No handoff file was written** — `~/.hermes/radar-ref/handoff/` held only `2026-10-27.json` at the 2026-10-29
audit, so **Notion writes and cover letters did not run again**.
- **Both stage-2 slots no-oped correctly** — `5fc292ff0f3b` fired **11:30:27 → 11:31:31** and
**14:30:27 → 14:31:43**, both `completed` with `delivery_outcome: suppressed`. Open question 1 is therefore
answered only in the negative: the recovery rule ("a stage-2 run with no handoff is a no-op") holds in
production, but nothing has yet proved the positive path end-to-end.
- **Open question 4 is answered: the row did not close.** `dca848_e93a538ade6b` stayed open because the 10-28
slot was not clean, and a second row (`dca848_0a2f03b5952b`) opened — open incident rows **2 → 4**.
## Related
- [[runbooks/job-radar]] — the two-stage contract, recovery procedure and the 2026-10-26 overrun